What happens if you dont edge concrete?

0
78
  1. Bleeding – Always Happens The water will end up reabsorbing into the concrete, so don’t start worrying about it or trying to swipe it off – just leave it alone.
  2. It will be fine.
  3. It is very very important to wait before continuing.

Subsequently, How do I get a smooth finish on concrete?

Can you overwork concrete? Never overwork or over finish the surface of any exposed concrete slab. This brings too much fine material to the surface, works out the designed air entrainment*, and will weaken the surface of the slab leaving the top of slab more vulnerable to freeze/thaw damage and sheet scaling*.

Yet, Should I put water on concrete after it is poured? ANSWER: Keeping concrete moist helps the curing process. Concrete hardens as a result of a chemical reaction, called hydration, between cement and water, not because it dries. The hardening, or curing, continues as long as moisture remains in the concrete.

Can you smooth out concrete after it dries? It is possible to smooth concrete after it dries, but in many cases, it requires a fresh layer of concrete over the top of the dried surface. This can allow you to keep the surface smooth and even, even though the concrete is completely dry.

What is the purpose of floating concrete?

Floating has to be done on virtually every concrete job after concrete is poured and leveled. (Leveling is usually accomplished with a screed.) When done properly, floating pushes the aggregate down into the concrete and encourages moisture to rise, helping the concrete dry and creating a smoother surface.

Why does my concrete look rocky?

The main reason why your concrete looks rocky is because it wasn’t tamped and floated properly. When you look at a smooth concrete patio, driveway, sidewalk or steps, what your actually seeing is cement and sand. This is because masons tamped the stones down and then smoothed the surface.

How long does 4 inches of concrete take to cure?

The general rule of thumb is that concrete takes about 28 days to dry for every inch of slab thickness. Within 24 to 48 hours, the concrete will be ready for foot traffic.

What happens if you dont water concrete?

Concrete that is not moist-cured at all dries too rapidly, and reaches less than half its potential design strength. It will also have a greater number of shrinkage cracks.

Is it OK if it rains after pouring concrete?

Rain falling on top of freshly laid concrete can damage the surface and compromise a level and floated finish. Even worse, if too much extra water works its way into the concrete mix, this can result in weak concrete overall.

Does concrete take 100 years to cure?

Does concrete take 100 years to cure? No, this is a bit of a myth with the concrete industry. While concrete does continue to harden indefinitely, pore moisture has to drop below a certain level at some point and this isn’t typically 100 years.

Should you water concrete after it is poured?

Many construction specialists recommend watering it down five to ten times per day, for the first week, starting 2-4 hours after it has been poured. The first two to four hours lets the concrete “finish”, which refers to the setting process.

Does wetting concrete help it cure?

Moist-cured concrete can be up to 50 percent stronger than concrete that was cured without being dampened! Spraying is not recommended for concrete poured during cold weather, however; for pours in chilly weather, see “Don’t Let Concrete Get Too Cold,” below.

How long should I water concrete?

The enclosed area is continually flooded with water. Ideally, the slab could be water cured for 7 days. Some builders on a tight schedule water cure for 3 days as this achieves approximately 80% of the benefit of water curing for 7 days.

Does spraying water on concrete help it cure?

Spraying water on your new concrete is one of the best and oldest ways to cure your concrete. After new concrete is poured and finished the concrete begins its curing process.

When should I start power floating concrete?

A rough guide for considering when to begin power floating is when walking on the surface leaves indentations of 3-4 mm. If the concrete is too wet the machine will tear up the surface, and if it is too dry, it will not be possible to trim high spots or fill low spots effectively.

What is the best pass method for a power float?

Start at a 90o angle to the last pass you did with the float pan. During this first pass, remember to use a flat finishing blade or a very slight pitch. Then, you can gradually increase the blade pitch through the next passes, so you will add more and more pressure to the concrete, making it more compact.

How long do you wait to power trowel concrete?

Once the footprint you leave is about and 1/8 inch to 1/4 inch, your concrete should be ready to support the weight of a power trowel. You’ll be able to tell right away if you’re sinking in.

Do you need to power float concrete?

Because the action of power floating essentially recompacts the concrete floor, plastic-shrinkage and cracking potentially caused by the concrete drying too quickly is closed together again. The smooth finish also means that the concrete floor is less susceptible to cracking in the future.

Why is my new cement cracking?

A piece of concrete in the open air usually shrinks during hardening. This shrinkage is due to the evaporation of part of the water contained in the concrete. Cracking occurs when shrinkage forces become greater than the strength of the concrete.

LEAVE A REPLY

Please enter your answer!
Please enter your name here